Final Push in Valatie



As of August of 2017, Habitat is in the home-stretch on the two Valatie homes. These are the first houses to be built in Valatie as part of the 30 homes by 2020 campaign. Volunteers are needed for the final stages of construction. Work includes interior painting, flooring, doors, trim work, and landscaping. If you would like to volunteer, please fill out an application on our website.

 

In July of 2016, Habitat broke ground in Valatie for the first two houses of the 12 needed to reach 30 homes by 2020. The Valatie build is supervised by Columbia County native Don Hills of Hills Construction Management. The 2-story, 1200 square foot Valatie passive townhouses feature:

  • 3 bedrooms and 1½ baths
  • Open living/kitchen area, first floor adaptable-use room and 2nd floor laundry space
  • Off-street parking and fenced backyard
  • High performance, energy-saving heating and cooling
  • Ichabod Crane School District